Traffic

Fox Dr W/B Sign Structure Installation

Fox Dr Westbound from Keillor Rd to Whitemud Dr Saturday, February 25, 10pm – Sunday, February 26, 2012, 6am Visit link: Fox Dr W/B Sign Structure Installation

 

50 St Force Main Construction

50 St, from Hwy 37 to 195 Ave 195 Av, from 50 St to 34 St 34 St, from 195 Av to Anthony Henday Dr Ongoing through Thursday, March 1, 2012, 3pm See original article: 50 St Force Main Construction

 

107 Ave NLRT Construction

107 Ave from 104 St to 106 St Thursday, February 23, 9am – Monday, March 5, 2012, 3pm Excerpt from: 107 Ave NLRT Construction

 

109 St Removal of Tower Crane

109 St from 100 Ave to Jasper Ave Friday, March 16, 8pm – Sunday, March 18, 2012, 6pm See more here: 109 St Removal of Tower Crane

 

Jasper Ave Building Demolition

Jasper Ave from 100A St to 101 St Friday, February 24, 7pm – Sunday, February 26, 2012, 8pm More: Jasper Ave Building Demolition

 

100 Ave Water Main Break

100 Ave from 106 St to 108 St Friday, February 17, 9am – Tuesday, February 21, 2012, 3pm Follow this link: 100 Ave Water Main Break

 

99 St S/B Metropolis Special Event

99 St Southbound from 102A Ave to 102 Ave Tuesday, February 21, 7am – Friday, February 24, 2012, 5pm See the original post: 99 St S/B Metropolis Special Event

 

104 Ave E/B Collapsed C.B. Barrel Repair

104 Ave E/B from 106 St to 107 St Tuesday, February 21, 9am – Thursday, February 23, 2012, 3pm Continue reading here: 104 Ave E/B Collapsed C.B. Barrel Repair

 

Whitemud Dr E/B Exit Ramp Sign Structure Installation

Whitemud Dr Eastbound Exit Ramp to Fox Dr Eastbound Saturday, February 18, 10pm – Sunday, February 19, 2012, 6am Link: Whitemud Dr E/B Exit Ramp Sign Structure Installation

 

Walterdale Br Bridge Deck Repairs

Walterdale Bridge Thursday, February 16, 10am – Friday, February 17, 2012, 2pm From 10 am to 2 pm daily Excerpt from: Walterdale Br Bridge Deck Repairs